CIO Audits

image.png

-Antes de comenzar la comprobación de estándares e información, guardar una copia del original en la carpeta de proyecto en curso con el protocolo de nomenclatura y ubicación específicos en el apartado de "Nomenclatura y estandarización de documentos"

Stage reviews:
To review the information at the end of the stages before sending it, a verification mechanism is established, with
a combination of software, incorporating all the above verifications. As part of these controls
Qualitatively, the information should be compared to the Design Responsibility Matrix.
- DRM)
or Model Production Delivery Table (MPDT) , to ensure that the information you are submitting is consistent with the required level of development/definition. Furthermore, it requires a
quantitative verification, to ensure that you are submitting all agreed deliverables according to the overall information development program ( MIDP ) and task information development program ( TIDP ).

For successful project kickoff meetings:
-Familiarize yourself with the project requirements and standards.
-Know the responsibilities of your team and the roles of the members.
-Also involves senior staff (e.g. directors, project managers)
-Identifies additional areas of development in Solibri templates and rule sets against specific project requirements.

Minimum data requirements:

The following fields must be checked in the Classifications and Properties dialog box for each element:

Classification (at least Archicad Classification, possibly another classification system if the specification is based on it)
- ID (if necessary for work scheduling)
- Structural function
- Position
- Rehabilitation Status
- Specification and Description Reference (if the specification is based on a proprietary system)
- Layer

Better practices:

-The LOI is not specific to the entire project/model; It is element specific.
-LOI is not specific to 3D (e.g., LOI can be achieved by providing the correct amount of
information in the specification).
-Clarifies in the early stages what information should be captured in the model and what information can be referenced to the specification via a hyperlink

Initial Review

daily review

Periodic revision

End of stage

- Estalecer y comprobar estándares

- Datos del Proyecto, Sitio y Edificio

- Nombramiento de los niveles

- Confirmar si se cumplen los requisitos del cliente según el proyecto

- Comprobar configuración del traductor IFC

- Check the Incident Log

- Federated model checking

- Status checks

-Asegurar que se sigan todos los estándares

- Confirmar si se cumplen los requisitos del cliente

- Comprobación de modelo federado

- Control de Costos

- Comprobaciones de estado

- Campos de información

- Gestión de IDs

- Validación de datos de activos

- Control del modelo según reglas de SOLIBRI

- Control de dudas de modelado/formación

- Check deliverables according to the EIR

- Data requirements by Stage

Checking model consistency in SOLIBRI

- Internal collision detection

- Non-continuous elements

- Element validation

- Element free space

- Layers

Once these checks have been carried out, a record of the changes made will be left in the Incident Log and will be shared in the CDE to be evaluated by the Head of Coordination.

Event log

Problem management and communication
via BCF