Work team audits

-Before starting the visual check, save a copy of the original in the current project folder with the specific naming and location protocol in the "Nomenclature and standardization of documents" section.
For successful project kickoff meetings:
-Familiarize yourself with the project requirements and standards.
-Know the responsibilities of your team and the roles of the members.
-Also involves senior staff (e.g. directors, project managers)
-Identifies additional areas of development in Solibri templates and rule sets against specific project requirements
Better practices
-Develop the 3D model as much as possible.
-Use associative/linked elements; avoid static annotations.
-Use the priorities of construction materials to define joints.
-Linked bookmarks will make it easier to navigate the project.
-Set the appropriate Rehabilitation Status and Filter before creating a detail.
-Do not place a detail within a detail.
-Do not generate annotations directly on the plans.
-Avoid using detailed profiles throughout the model; use them only when necessary.
-Use source detail markers when exporting to BIMx.
-Uses model-derived detail generation workflows to utilize model data
Initial Review
Revisión diaria
Periodic revision
End of stage
- Placement of the origin point
​
- Project, Site and Building Data
​
- Appointment of levels
​
- Project Navigator Organization
​
-Checking project standards
- Identify modeling errors
​
- Duplicate items
​
- Layers
​
-Graphic Overwrite Rules
​
- File-File Size Optimization
​
- Virtual tracking-Trace and reference
​
- Consolidation of Outline and Plot
- Naming of the rooms in the model
​
- Identification of Unnecessary Elements
​
- Incorrect Location/Orientation of Models
​
- Project Navigator Organization
​
- Check the Incident Log
​
-Checking project standards
​
-Verification of information
​
Once these checks have been carried out, a record of the changes made will be left in the Incident Log and will be shared in the CDE to be evaluated by the Head of Coordination.