top of page

Work team audits

image.png

-Before starting the visual check, save a copy of the original in the current project folder with the specific naming and location protocol in the "Nomenclature and standardization of documents" section.

For successful project kickoff meetings:
-Familiarize yourself with the project requirements and standards.
-Know the responsibilities of your team and the roles of the members.
-Also involves senior staff (e.g. directors, project managers)
-Identifies additional areas of development in Solibri templates and rule sets against specific project requirements

Better practices
-Develop the 3D model as much as possible.
-Use associative/linked elements; avoid static annotations.
-Use the priorities of construction materials to define joints.
-Linked bookmarks will make it easier to navigate the project.
-Set the appropriate Rehabilitation Status and Filter before creating a detail.
-Do not place a detail within a detail.
-Do not generate annotations directly on the plans.
-Avoid using detailed profiles throughout the model; use them only when necessary.
-Use source detail markers when exporting to BIMx.
-Uses model-derived detail generation workflows to utilize model data

Initial Review

Revisión diaria

Periodic revision

End of stage

- Placement of the origin point

​

- Project, Site and Building Data

​

- Appointment of levels

​

- Project Navigator Organization

​

-Checking project standards

- Identify modeling errors

​

- Duplicate items

​

- Layers

​

-Graphic Overwrite Rules

​

- File-File Size Optimization

​

- Virtual tracking-Trace and reference

​

- Consolidation of Outline and Plot

- Naming of the rooms in the model

​

- Identification of Unnecessary Elements

​

- Incorrect Location/Orientation of Models

​

- Project Navigator Organization

​

- Check the Incident Log

​

-Checking project standards

​

-Verification of information

​

Once these checks have been carried out, a record of the changes made will be left in the Incident Log and will be shared in the CDE to be evaluated by the Head of Coordination.

Event log

Saved

© 2024 JAVIER DE PUELLES FERREIRO

bottom of page